Tanat Valley 3 by Peter Drost
Commissioning of the new S7 test track is on target for our meeting on 17 March. This will provide a 60ft continuous run with a passing loop for stock storage and a minimum radius on the curves of 6ft 8in. This should allow us to run larger locomotives with longer trains than has been possible on our old track.
Julian Russell
TopSelect an area group for more information and the group reports