West Sussex O Gauge Group November 2020

Limited running was re-established in August, with a maximum of six members attending each meeting. To ensure fairness no member could attend two consecutive monthly meetings.

Before the first lockdown a shed had been built on the site, in which the test track could be stored. Sparing the upholstery of members’ cars, while transporting the board/support legs, etc. However, complacency in transporting baseboards, by others, is an ever present threat, as experienced at the October meeting when a number of boards, awaiting erection fell over onto the S7 track. Full running is now suspended while the PW team undertake repairs.

Top